Skip to main content

Highway Photos

 

highways image

9/11/12 - Town of Clarence Highway Department paving roads in the Clarence Center area.

highways 2

9/11/12 - Town of Clarence Highway Department - paving roads in the Clarence Center area.

highways 3

April 2014 - Superintendent of Highway, James Dussing  and Eagle Scout Emmett Maciuba pictured by one of the Town's Historic signs in Clarence Center.  Emmett worked on repainting the sign for an Eagle Scout Project.

highways 4

June 2014 - Clarence Center Elemtary Students visit the Town Highway Department.  Superintendent James Dussing gives them a tour of the garages.

highways 6

June 2014 - Superintendent of Highway James Dussing and Deputy Supt. Charles McNiff give a tour of the Highway Department to the Clarence Center Elementary Students.

highways 7

September 15, 2014 - Heather Harper, Account Executive at UNYTS; James Dussing, Superintendent of Highways; Paul Englert, Highway Crew Chief and his wife Denise Englert at a Blood Drive at the Clarence Highway Department in Honor of Paul and Denise's son Paul Jr.

highways 8

2014 Drainage Work

highways 9

2014 Drainage Work

highways 10

2014 Drainage work

highways 11

2015-Highway Employees Jeff Loudenslager and Doug Snyder pickup leaves and yart waste to compost.  The Grepple was purchased in 2014 with a 50% matching Grant from NYS DEC.

highways 12

2015 - Highway Employee Jim Englert Jr, Maintenane Worker, loads the Hopper on hte departments new paver.

highways 13

Ditch Work - Recent Drainage work completed by the Highway Department to improve the flow of water.  This ditch takes water from Lapp/Heise area notrh to the "Sate Ditch" and then to Black Creek.

highways 14

2015 - Highway Department Employees replace a sidewalk that was removed during the large tree removal in Clarence Center.

highways 15

2015-Highway Department demolishing the old Parks Office/Shop/Maintenance Building.

This is being replaced with new bathroom facilities for the Main Street Town Park.

highways 16

2015-Highway Department Employee Marshall Helms, HEO, "limbing" a dangerous tree in the right-of-way that was removed by the Clarence Highway Department.

highways 18

2015 - Highway Department - Preparing the area for the Department's new Salt Storage Structure.

highways 19

2015 - Highway Deptartment employee Marshal Helms, HEO,  is rolling in the binder course for a resurfacing job on Willowlake Drive.

highways 20

2016 - Highway Employees are moving stockpiled dirt to Memorial Park for a future athletic/recreation field.

highways 21

2016-Highway loading salt from the new salt barn during the February snow fall.

highways 22

2016- This is the new salt storage building at the Clarence Highway Department.  The building was built by Hybrid building Solutions of Clarence and is 72'x100'.  The building will hold in excess of 4000 tons of road salt and replaces the current 1,500 ton wooden structure.

highways 23

2016 - Highway employees re-paving Oakfield Lane in the Loch Lea subdivision using the town’s new Caterpillar paver.

highways 24

2016 - Highway employees re-paving Oakfield Lane in the Loch Lea subdivision using the town’s new Caterpillar paver.

highways 25

highways 26

11-16-17 Martin Road Bridge Replacement Project

highways 27

Town of Clarence Highway Dept. Salt Barn

highways 28

highways 29

12/2017- Highway Department Drainage Project at Clarence Center Village.

Changed